1 PAKISTAN STUDIES MCQS

Dasu Dam is located in which province of Pakistan?

  • Sindh
  • Punjab
  • Balochistan
  • Khyber Pakhtunkhwa (KPK)
Correct Answer: D. Khyber Pakhtunkhwa (KPK)

Detailed Explanation

Dasu Dam is located in the province of Khyber Pakhtunkhwa (KPK), Pakistan. Specifically, it is being constructed near the town of Dasu in the Upper Kohistan district, along the Indus River. This area is mountainous and rich in water resources, making it ideal for hydropower generation.



Dasu Dam is a major hydroelectric project that aims to generate a large amount of electricity to meet Pakistan growing energy needs. It is being developed by the Water and Power Development Authority (WAPDA). The project is considered one of the most important in Pakistan energy sector because it focuses on producing clean and affordable electricity using water.



The construction of Dasu Dam is being carried out in multiple phases. In the first phase, the dam will generate over 2,100 megawatts (MW) of electricity. Once all phases are completed, the total capacity is expected to reach around 4,320 MW. This will make it one of the largest dams in Pakistan in terms of power generation.



The dam will not only help in producing electricity but will also control flooding, store water for irrigation, and contribute to the overall development of the region. Local communities are also expected to benefit from infrastructure improvements, job opportunities, and better connectivity.



Important Facts:



  • Location: Upper Kohistan, Khyber Pakhtunkhwa (KPK)

  • River: Indus River

  • Project Type: Hydroelectric Power Project

  • Developed by: WAPDA

  • Capacity (Final): Around 4,320 MW

  • Benefits: Electricity generation, flood control, water storage, regional development

  • Status: Under construction (Phase-wise)



In conclusion, Dasu Dam is located in Khyber Pakhtunkhwa (KPK). It is a major step toward solving Pakistan electricity problems and promoting clean energy for future generations.